Saas for SMBs
Playbooks and case studies covering saas for smbs.
How Long Does an MVP Actually Take, Start to First User
A 4-6 week MVP promise almost never means 4-6 weeks of calendar time. Here is what actually happens between contract signature and first real user, and the three client-side stalls that reset every downstream phase.
When to Hire Your First In-House Engineer
Your advisors say it's time to hire a full-time engineer. The math on runway, ramp-up, and break-even says wait until you can answer three specific questions. Here's the framework.
Deprovision a Departing Employee Without Breaking Production
Revoking a backend engineer's admin access is the easy part. The outages happen because their personal AWS key was quietly powering a production Lambda — and nobody audited before pulling the plug.
RAG Is Not a Search Problem. It's a Retrieval Contract.
Most broken RAG prototypes fail in the retrieval layer, not the model. Here's how to think about RAG as a chain of contracts — and where the silent degradation actually happens.
Managed Cloud vs. Raw IaaS: Pick One Before You Scale
Most managed cloud vs IaaS comparisons argue price-per-vCPU and deployment speed. Both miss the axis that determines regret at 18 months. Here's a decision framework built around the resource you actually don't have enough of.
Migrate a Live MySQL Schema Without Downtime
Most guides tell you to run gh-ost and walk away. They skip the part where the cutover step — not the copy — is what actually causes the 2 a.m. outage. Here's the playbook that survives production write load.
CRON Job Failure Cheatsheet: Diagnose, Alert, Recover
A dense reference for backend engineers whose scheduled jobs fail silently in production. Covers heartbeat monitoring, alert patterns, and recovery playbooks for missed runs.
5 Mistakes Teams Make When Adding Real-Time to a Batch System
Retrofitting real-time onto a batch system rarely fails because of Kafka tuning. It fails because your schema was designed to be overwritten in bulk. Here are the five structural mistakes we see teams repeat, and how to recover.
Event Sourcing Is Not a Database Pattern
Most teams implement event sourcing as an event log next to their CRUD tables and end up with the complexity of both models and the benefits of neither. Here's the mental inversion that actually makes it work.
Build vs. Buy Your Internal Ops Dashboard
Most build-vs-buy comparisons for internal tools argue about cost and speed. Both are the wrong axes. The one that predicts regret is the rate of change of your ops logic — here's how to score it honestly.
Synchronous API vs. Async Queue: Pick One and Commit
Retrofitting queues onto slow endpoints one at a time creates a hybrid mess. Here's the real decision rule: who owns the failure, the caller or the callee?
5 Mistakes Teams Make When Migrating from Monolith to Microservices
Most monolith to microservices migration guides describe the happy path. This is the other one: the five failure modes that show up after the first two services are live and the shared database is still lying to you.
_1751731246795-BygAaJJK.png)